The town appoints me to issue permits for new homes as you must be state licensed to issue those permits.
Any other permits would be issued by the town.
Contact your local town officials.
Address numbers and culvert permits are obtained from the Town.
Owners are responsible to for compliance with setback rules for structures
Note: Permits are now required for manufactured homes that were once called mobil homes, single or double wide homes..
CLICK HERE to get started on a new home application
After you have completed the electronic form you will need to do the following:
1. Send a check made out to Tom Smith Inspections LLC for the permit fee.
2. Ask your HVAV installer to provide the “Res Check Form” to me. They will know about this requirement and provide it as part of your installation.
The company or you can send to me in paper form or as an email with attached PDF file.
3. Send one copy of your building plan. It can be sent in paper form, or a computer version sent to me by email attached or PDF file.
4. My files are all identified by street address so be sure to include that on any correspondence .
Permit Fee for Dwelling Permit
Dwellings up to 800 sq. ft. —— $368
Dwellings over 800 sq. ft. $ 368 plus 25 cents for footage over 800 sq. ft.
Permit Fee for Manufactured Home Construction
Dwellings up to 800 sq. ft. —— $245
Dwellings over 800 sq. ft. $ 245 plus 25 cents for footage over 800 sq. ft.
Special electrical inspection not associated with a building permit but might be requested by owner or utility . Fee $30
Address numbers and culvert permits are obtained from your local Town government.
WARNING _ The town will be enforcing penalties for non-conforming driveways.
Owners are responsible to for compliance with set back rules for structures.